So I noticed a few bugs.
1. Contracted piece of engineering memo without price
Picture
2. Racing report headlines mixed up
Surely the first column should be named
costs
Picture
3. 'Used in' table unscrollable
Picture
4. New body type memo without mentioning the name of the new item
Picture
Also buldings of factories is shown as racing setup costs in the revenue and expense report.
Some rounding mistakes in weight, for an engine contract I designed an engine that a few kg lighter than the maximum weight requirement, I couldn't select it for the contract, when I check I noticed the weight in pounds was higher than requirements, but in kg's it was lighter.
Place holder as I fixed them.
I have fixed
#2
#3
#1
#4