07-28-2015, 08:43 AM
Can anyone provide some information on about what i'm doing wrong with these kind of contracts?
Here's what they wanted:
Request Pt. 1
Request Pt. 2
And what i designed:
Locomotive Engine
And even if i offer this engine at 1501$ (Production costs 1500$) they decline it.
I failed to make a cheaper version with stats anywhere near of what they asked.
Thanks in advance.
---
Pft... i tested the savegame downwards from 3199$ to 1501$ multiple times... all declined. Been away from the pc for like 30min and now got the contract for 1999$...
So it's the time you're away from the keyboard i guess :p
Here's what they wanted:
Request Pt. 1
Request Pt. 2
And what i designed:
Locomotive Engine
And even if i offer this engine at 1501$ (Production costs 1500$) they decline it.
I failed to make a cheaper version with stats anywhere near of what they asked.
Thanks in advance.
---
Pft... i tested the savegame downwards from 3199$ to 1501$ multiple times... all declined. Been away from the pc for like 30min and now got the contract for 1999$...
So it's the time you're away from the keyboard i guess :p