Visual Entertainment and Technologies Forum

Full Version: Material cost inconsistencies with outsourced components
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
Figured I'd give the Edward Jordan achievement a try in 2.4.0.2 but I can't even figure out how much the vehicles I'm designing cost when they're using outsourced components.

View Part and Modify Part have different values listed in the same column:
[Image: image.png?ex=670f05a2&is=670db422&hm=f4a...ca847338d&]

Sales projections are based on the lower cost (which was also the one visible in the vehicle designer):
[Image: image.png?ex=670f06f8&is=670db578&hm=a86...4f79c420e&]

But contract bidding is using the higher cost:
[Image: image.png?ex=670f0718&is=670db598&hm=655...607fa460d&]