08-17-2023, 08:54 AM
(This post was last modified: 09-09-2023, 01:18 AM by Eric.B.
Edit Reason: Clarification
)
This happens in 2nd Gear, version 2.1.0.2 when designing a vehicle. As soon as I hit "Build" to check the marque assignment on the trim, the pop-up tells me the trim will be done in 5 months, even though the "original" model takes 15 months to design. But the Development Pace slider appears, so I can close the Build pop-up and adjust the development pace. I think that also makes trims way cheaper than they should be.
EDIT: Hmm, it doesn't happen every time. Haven't figured out yet what triggers this behaviour, sorry.
EDIT: Hmm, it doesn't happen every time. Haven't figured out yet what triggers this behaviour, sorry.