Ref: http://www.ventdev.com/forums/showthread...90#pid7390
Idea seems to be: Every engine that is being manufactured for contracts needs 1 factory production line. That sounds good and useful.
I have two contracts for my "Uni 4 HP" engine. I also think both engines have the same revision number, so there was no engine modification between those both contracts, as I do upgrade my parts as soon as they are designed nearly to their maximum.
Bug 1: I must assign two production lines. One for each contract. If I don't assign the two lines the assign-prompt pops up regularly (see screenshot#1) as well as there is no production.
Bug 2: If I don't assign a production line, the engine is not going to be produced for that contract, but the contract stays the same. Neither does the delivered engine count go up, but also the remaining breaches as well as the remaining time stay the same (see screenshot#2).
The savegame (4,87 MB zipped) is packed with 7zip as an attachement to this post:
One contract (Project Picture) is currently not assigned, the production line for this project as well as the second project for the same engine was and is at Cleveland factory.
Idea seems to be: Every engine that is being manufactured for contracts needs 1 factory production line. That sounds good and useful.
I have two contracts for my "Uni 4 HP" engine. I also think both engines have the same revision number, so there was no engine modification between those both contracts, as I do upgrade my parts as soon as they are designed nearly to their maximum.
Bug 1: I must assign two production lines. One for each contract. If I don't assign the two lines the assign-prompt pops up regularly (see screenshot#1) as well as there is no production.
Bug 2: If I don't assign a production line, the engine is not going to be produced for that contract, but the contract stays the same. Neither does the delivered engine count go up, but also the remaining breaches as well as the remaining time stay the same (see screenshot#2).
The savegame (4,87 MB zipped) is packed with 7zip as an attachement to this post:
One contract (Project Picture) is currently not assigned, the production line for this project as well as the second project for the same engine was and is at Cleveland factory.